The Italian Job: Part 6
A little over two weeks into our E-Type reconstruction has yeilded some quick results.
Fitted is the complete exhaust and intake systems including the Porcelain-coated manifolds that distinguish this build from most.
Not pictured is the fabled reaction plate install which was accelerated by releasing all the tension on the arms and wiggling the four bolts through by hand.
What else can I say. Oh yea the complete rebuild of the hydraulic brake system took a little time too.
No Comments