The Italian Job: Part 5

Italian Job is back in the shop!

Here is 1 week’s progress. The 4.2 lump is back in and the accessories can now get piled on.

In many ways the E-Type engine bay was designed to look as good as it ran.

With the engine in we could route the electric wires on the subframe then start on the firewall bits.

IMG_8022

IMG_8031

IMG_8029

IMG_8026

IMG_7965

Leave a Reply

Your email address will not be published. Required fields are marked *